Gediz
Kirikkale

Isparta

Engineering | Procurement | ConstructionOperations | Maintenance | Asset Management
Isparta: Driving Clean Energy Innovation in Turkey

A Vision for Sustainability

The Isparta Solar Project contributes to Turkey’s clean energy transition, enhancing solar power accessibility and efficiency. With an installed capacity of 7.08 MWp, this project reinforces Turkey’s renewable energy strategy while reducing dependency on fossil fuels.

By utilizing Jinko Eagle panels and Huawei inverters, Isparta maximizes energy generation efficiency and grid stability.

Overcoming Challenges with Innovation and Teamwork

Deploying the Isparta Solar Project required addressing:

  • Land Use Optimization: Engineers implemented tailored solar layouts to enhance energy efficiency.
  • Seamless Grid Integration: The project team deployed advanced inverter solutions for stable energy transmission.
  • Sustainability Measures: The project adhered to environmental policies, ensuring responsible energy development.

Through cutting-edge technology and engineering precision, Isparta was successfully delivered.

The Human Impact

The Isparta Solar Project has strengthened local job markets, creating employment opportunities in solar energy operations.

With 8,496 MWh of clean energy production annually, Isparta powers over 2,360 homes, providing sustainable and affordable electricity.

Powering the Future

With a 7.08 MWp installed capacity, Isparta Solar Project highlights SUNEL Group’s commitment to clean energy solutions, reinforcing Turkey’s renewable energy future.

Project Overview

Location: Turkey
Construction Period: 2018
Size: 7.08 MWp
Inverters: Huawei 36KTL – 40 kWe
Panels: Jinko Eagle – 275Wp
Mounting System: Alumil

Key Highlights

Annual Energy Production: 8,496 MWh
Equivalent Homes Powered: 2,360 homes
CO₂ Emissions Reduced: 4,248 tonnes annually